Quality Assurance and Inspection

The gap between specification and production is closed in the factory, not on site.

What the work involves

  • —Coordination of factory oversight during production
  • —Pre-shipment inspection against the approved configuration
  • —Checking finish, dimensions, hardware and glass build-up against the order
  • —Reporting discrepancies before goods are packed

What the project team receives

  • —Inspection coordination ahead of dispatch
  • —Issues resolved while correction is still practical

Why it matters

Once a container leaves the factory, a defect stops being a production issue and becomes a programme issue. Inspection at the factory is the last point at which a non-conforming unit costs a rework instead of a shipment.

Consistency across a production run matters more than any single sample. Finish, gasketry, hardware fit and glass make-up have to hold across every unit, not only across the units prepared for review.

Who it serves and where it fits

  • —Contractors and installers who will discover any defect on the jobsite.
  • —Developers protecting handover dates across multi-building programmes.
  • —Architects confirming that the delivered system matches what was approved.
  • —It sits during production and immediately before shipment.

How it reduces procurement risk

  • —Non-conformity is found in the factory rather than on site.
  • —Production is checked against the approved configuration and the approved samples.
  • —Packing and protection are confirmed before units are loaded.